Posted: January 7th, 2016
Research and analyse the conduct of the following high-profile projects/programmes: (30 marks)
The UK ‘Fire control’ project
Then:
(ii) Discuss what is meant by ‘successful’ and whether the project/ programme you have selected was OR was NOT considered successful, and
(iii) Analyse and discuss some of the factors or practices that contributed to this outcome (successful/not successful). To what extent are these a result of good/poor project/programme strategy? Illustrate your answer with examples from the case study and theory.
(iv) Suggest how utilisation of programme or project ‘best practice or theory’ either contributed to the success or might have improved the situation/ avoided the problems.
(70 Marks)
QUESTION 2:
(i) Research and analyse the programme that created the BBC W1 Programme (Phases 1 & 2) which delivered in 2012. (30%)
Then:
(ii) Discuss why this programme was considered successful, to what degree you agree that that is so, and the ways in which good programme strategy may have contributed (70%)
Place an order in 3 easy steps. Takes less than 5 mins.