What would the bid price have been if departmental overhead rates had been used to apply overhead cost?

Plantwide versus Departmental Overhead Rates: Underapplied or Overapplied Overhead.

Don’t tell me we’ve lost another bid!” exclaimed Sandy Kovallas, president of Lenko Product, Inc. “I’m afraid so,” replied Doug martin the operations vice president. “One of our competitors underbid us by about $10,000 on the Hastings job.” I just can’t figure it out.” Said Kovallas. “it seems we are either too high to get the job or too low to make any money on half the jobs we bid anymore. What’s happened?”

Lenko Products manufactures specialized goods to customers’ specifications and operates a job-order costing system. Manufacturing overhead cost applied to jobs on the basis of direct labor cost. The following estimates were made at the beginning of the year.

Department

Cutting Machining Assembly Total Plant
Direct labor $300,000 $200,000 $400,000 $900,000
Manufacturing overhead $540,000 $800,000 $100,000 $1,440,000

Jobs require varying amounts of work in the three departments. The Hastings job, for example, would have required manufacturing costs in the three departments as follows:

Department

Cutting Machining Assembly Total Plant
Direct materials $12,000 $900 $5,600 $18,500
Direct labor $6,500 $1,700 $13,000 $21,200
Manufacturing Overheard ?? ?? ?? ??

The company uses a plantwide overhead rate to apply manufacturing overhead cost to jobs.

Required:
1. Assuming the use of a plantwide overheard rate:
a) Compute the rate for the current year.
b) Determine the amount of manufacturing overhead cost that that would have been applied to the Hastings job.

2. Suppose that instead of using a plantwide overhead rate, the company had used a separate predetermined overhead rate in each department. Under these conditions:
a) Compute the rate for each department for the current year.
b) Determine the amount of manufacturing overhead cost that would have been applied to the Hastings job.

3. Explain the difference between the manufacturing overhead that would have been applied ot the Hastings job using the plantwide rate in question 1(b) and using the department rates in question 2(b).

4. Assume that it is customary in the industry to bid jobs at 150% of total manufacturing cost(direct materials, direct labor, and applied overhead). What was the company’s bid price on the Hastings job? What would the bid price have been if departmental overhead rates had been used to apply overhead cost?

5. At the end of the year, the company assembled the following actual cost data relating to all jobs worked on during the year:

Department

Cutting Machining Assembly Total plant
Direct materials $760,000 $90,000 $410,000 $1,260,000
Direct labor $320,000 $210,000 $340,000 $870,000
Manufacturing overhead $560,000 $830,000 $92,000 $1,482,000

Compute the underapplied or overapplied overhead for the year (a) assuming that a plantwide overhead rate is used, and (b) assuming that department overhead rates are used.

Order a unique copy of this paper
(550 words)

Approximate price: $22

Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency

Order your essay today and save 10% with the discount code tCPCOVID10