The result of their work is presented in the Table 1.
Table 1
Acivity Abreviation Duration in Days Predecessor
Recording
Spectaral analysis and calculation
Technical Requirements
Contacting suppliers
Board design
Algorithm development
Embedded system
Testing A
B
C
D
E
F
G
H 30
60
15
15
20
90
90
10
A
B
C
C
B
F, D, E
G
TASK 1 (16 marks)
Develop Project Schedule network:
a) Draw Network Diagram
b) Determine Critical path
c) Forward Pass Calculation (Early Start, Early Finish)
d) Backward Pass Calculation (Late Start, Late Finish)
e) Slack (Float) Calculation.
The calculations have to be commented using at least 3-5 sentences for explanation, and scenarios.